Piping engineering
Send a job offer directly to this candidate
Oct-2019 – Present NB Engineering Bangkok Thailand
Shell Eastern Petroleum(PTE) Ltd.Pulau Bukom Refinery Singapore
Responsible for CD5 Area tag all of equipment, piping,instrument/number,SP-iteam location check/record according P&ID Plot Plan by 3D LFM laser scan data model as project requirement
Feb-2011 - May-2017 CUEL Limited Bangkok Thailand
Chevron Thailand Exploration & Production
Hub And Well Platform Project All Phase of Thailand
Responsible for Supervise/ Lead the project design team for piping including determining work assignments and meeting project budget and schedule
Perform design work utilizing 3D CAD systems
Participate in the generation of proposals, scopes, schedules and budgets Participate in design coordination with engineers and project management
Provide input to and help develop P&IDs, equipment specifications, vendor proposals and technical studies Mentor junior staff Act as design lead on assigned projects
Participate in construction support activities including responses to requests for information submittal reviews, construction site visits and inspections, and design revisions/ management of change Support Piping HOD in managing the design group in team to develop all technical details and to control workmanship within budget and schedule as projects to supervise design required Detailed Design Piping engineering ,Piping Ga p&id isometric pipe support Materials take off, tie-in location 2D,3D piping Equipment,instrument Model
All data sheets checking,comment,TQ Shop fabrication, As-Built all Dwg.
Supervisor supports all from piping engineering designers control and monitoring of expenditure on alignment piping systems
Jul-2010 – Jan-2011 AMEC OIL& GAS Kuwait
Kuwait Engineering Office Working in Kuwait
Saudi Arabian Chevron Inc, Kuwait Gulf Oil Co(K.S.C)Joint Operations JO
Combined Gas Utilisation Project (CGUP) OIL FIELD
Responsible for FEED And Detailed Design Piping engineering And Construction Gas Gathering as Processing including Vapour Recovery Plant and equipment Main Gathering Center (MGC)
Pressure Maintaining Plant (PMP) Main Gas Scrubber (MGS) 8 Eocene Sub Centers SUG
Sub,Safety H2S enter SC-20 Booster Station Central Gas Gathering plot plans Detailed Design
SC-20 Sub Center Saudi Arabian Area plant modification, p&id isometric materials tie-in
Ste survey pipeline equipment,instrument data sheets checking,comment
Supervisor supports all from piping engineering designers control and monitoring of expenditure on alignment piping systems
Documents/My Documents/nikom-cv2015.doc\2 of 2
Feb-2009-Jun-2010 AMEC OIL& GAS Kuwait
Kuwait Engineering Office Working in Kuwait
Saudi Arabian Chevron Inc, Kuwait Gulf Oil Co(K.S.C) Joint Operations JO
MGC Upgrade Processing Facility Project OIL FIELD
Responsible for Common,Eocene And Ratawi Process Area plant modification,plot plant p&id isometric materials tie-in site survey equipment,instrument data sheets checking,comment supervisor supports all from piping engineering designers control and monitoring of expenditure on piping systems And piping construction
May-2007- Nov-2008 FOSTER WHEELER ENERGY LIMITED UK
ENOC PROCESSING COMPANY L.L.C(EPCL)
Responsible for Technical Study & Detailed Design plat 10 pds 3D piping design equipment modeling Isometric P&id Comments Detail design, MTO pipe support, Technical
Query Site Construction And Engineering
Aug-2005-Feb-2007 TOYO-THAI Corporation Bangkok Thailand
Bayer Thai Co,Ltd
Responsible for lead evapolation and off site area
3d pds piping design equipment modeling Isometric plot plant, pipe support, p&id comment technical query mto.piping GA. control and monitoring of expenditure on piping systems relative to budgets. correct selection of materials plant and equipment, and to assist in the quantification, procurement and monitoring of the progress of materials plant and equipment through all stages of projects.Technical Query Site Construction And Engineering
Sep-2004-June-2005 CTCI Corporation Taipei Taiwan R.O.C
Ethylene Plant Olefins III Project
Responsible for lay-out unit 100,900 Heater unit 3d pdms piping design equipment Model
Isometric piping plant pipe support p&id comment. Technical Query Site Construction And
Experience with Foster Wheeler Thailand
2004 - 2004 New Zealand Refining Company Ltd.
New Zealand Future Fuels Project 3016
Marsden Point, Whangarai, New Zealand
Documents/My Documents/nikom-cv2015.doc\3 of 3
Responsible for Isometric,Materials, Pipe Support, Instruments, PEFS and CED Mark-up Model
Comment. Piping detail design
2003 – 2004 Oriental Petrochemical Corporation
Shanghai, Peoples Republic of China
Responsible for Process Area Purification, Crystallisation TA Storage HP Dissolver Separation and PTA Dryer, 3D PDS Piping, Equipment Modelling GA, Plot Plan, Isometric, P&ID Comme
Shell UK Exploration & Production, St Fergus, Scotland
Responsible for Process Area 3D PDS Modelling Piping, Pipe Support Isometric Extraction and
Checkers 2D Isometric EFD Mark-up.
2002 – 2003 Sasol Chemical Industries Limited, South Africa
Acrylic Acid and Acrylates Plant
Responsible for tank yard area 3D PDS design Isometric extraction equipment modelling, pipe support design EFD comment, plot plan, piping lay-out and line shoot.
2001-2002 Bayer Thai Co., Ltd.
Responsible for evaporation and existing process area 3D PDS design isometric extraction equipment modelling pipe support design EFD comment, technical query for field construction and engineering.
2000 – 2001 Bayer Thai Co., Ltd.
Responsible for plant modification site update and as-built 3D PDS piping design isometric extraction.P&ID Mark-up MTO,Technical Query Site Construction And Engineering
1999 – 2000 Shell Philippines Exploration B.V.(SPEX)
Malampaya Onshore Gas Plant (MOGP)
Responsible for methanol recovery methanol column, water treatment utility (service) water treatment and storage area. Also 3D PDS piping design, piping layout equipment, pipe support modelling and faultfinding EFD comment.
1999 - 2000 Confidential Client, Confidential Project
Responsible for extract heater, tanks and piperack. Also responsible for MP refining unit (U-100)
3D PDS piping design, equipment modelling isometric extraction and pipe support design and fault finding GA and EFD comment.
Documents/My Documents/nikom-cv2015.doc\4 of 4
1998 – 1999 Bayer Thai Co., Ltd.
Responsible for evaporation and internal rack area 3D PDS piping design isometric extraction equipment modelling pipe support design EFD comment, Technical Query Site Construction
1997 – 1998 Esso (Thailand) Public Co., Ltd.
Responsible for the design and layout production of piping general arrangements (OSBL) for the
CCR2, APS2, Utilities plant and also responsible for piping GA & Tie-ins for expansion project
1996 – 1997 Beta Clough for Submicron Technology Co., Ltd.
Piping Co-ordinator
Responsible for isometric drawing and revise materials take off and order shop fabrication and field installation subcontractor control.
1995 – 1996 Chiyoda (Thailand) Ltd.
For Thai Oil Company Limited
Responsible for site checked for piping field modification make field sketch for field modification revise isometric drawing for re-issued make drawing for special pipe supported piping arrangement (GA) and P&ID drawing for revise follow field modification and as built drawing.Technical Query Site Construction And Engineering
1995 Hitachi Zosen For Petroleum Authority of Thailand
PTT Gas Rayong (GSP-3) Project
Responsible for Technical Query Site Construction And Engineering making isometric drawing for construction re-check isometric drawing sketch first issue to checked isometric drawing by
AutoCAD.
1994 – 1995 PAE (Thailand) Ltd.
For Star Petroleum Refining Co., Ltd.
Responsible for design, layout and draft process piping system Technical Query Site
Construction And Engineering for the project. Also check isometric drawings against piping plant, checklists of materials piping specifications. And prepared spool drawing for fabrication.
1994 Sino-Thai Engineering and Construction Public Co., Ltd.
For Thai Oil Co., Ltd.
Responsible for checking and clearing isometric drawings for shop fabrication progress report.Technical Query Site Construction And Engineering
1993 – 1994 Sino – Thai Engineering and Construction Public Co., Ltd.
For Esso (Thailand) Public Co., Ltd.
Documents/My Documents/nikom-cv2015.doc\5 of 5
Sriracha Refinery Expansion Project (ASP-II)
Responsible for compilation of piping fabrication report checking and clearing isometric drawings for shop fabrication progress report.Technical Query Site Construction And
1992-1993 Sino – Thai Engineering and Construction Public Co., Ltd.
For Esso (Thailand) Public Co., Ltd. Sriracha Refinery Expansion Project (CCRII)
Responsible for Technical Query Site Construction And Engineering issue isometric
Diploma in Engineering – Metallurgy and self learning skills