Skip to main content
Tanner Porter

Tanner Porter

Fiber Construction and Splicing Manager

Talent
WashingtonMember since October 28, 2026
Outside PlantInside PlantfibercoppercoaxialdesignOSPISPSplicingpermittingL&IMicrosoft SuiteExcelACECell backhaulmanagementrelationship buildingproblem-solving
·

Hire this person

Send a job offer directly to this candidate

Outside PlantInside Plantfibercoppercoaxial

About

Extensive training and aptitude for Outside Plant and Inside Plant Planning and Construction coupled with strong management, relationship building and problem-solving skills. Prepared to excel in the telecom field.

Experience

Fiber Construction and Splicing Manager at Astound Broadband (2021-07 – Present)

  • Manage all business fiber, maintenance, and internal fiber transport projects within assigned areas.
  • Budget and forecast fiber augment and maintenance work.
  • Assign work to construction contractors, internal splicers, permit techs, and internal engineers.
  • Maintain relationships with municipalities as well as business customers and internal HFC team.
  • Conduct site walks to create scopes of work and design fiber routes.

Project Manager at Track Utilities LLC (2020-12 – 2021-07)

  • Manage all construction and financial aspects of work assigned to me within a 3-state area
  • Issue work to and manage all in house crews and subcontractors performing various portions of each job.
  • Report to customer progress and roadblocks on a regular basis
  • Manage end of month financials, approve invoices, create and cost purchase orders

Construction and Engineering Supervisor at Cablecom LLC (2020-09 – 2020-12)

  • Oversee and manage all fiber construction jobs from start to finish.
  • Schedule and manage fiber design, splicing, asbuilting, pre-construction and costing.
  • Work with subcontractors, bid subcontracting, and update and work with the customer to meet deadlines.
  • Design and manage node splits, out of service cuts, fiber transports, fiber to the business, and cell backhaul
  • Design Fiber build transports as well as fiber to the business, home, and tower

SR. OSP/ISP Field Engineer/ FTTT Manager at Nexius Solutions (2018-02 – 2020-09)

  • Pre-field OSP and ISP jobs for new build and expansion.
  • Communicate with CenturyLink and EL06 contractors about customer needs and service requirements.
  • Build OSP jobs (Boring/Trenching/UG and Aerial Placing) to CenturyLink satisfaction to provide service.
  • Determine low voltage cabling and equipment needs on ISP jobs.
  • Co-ordinate between Centurylink Fiber Engineers, Permitting, Marketing, Construction Contractors and Customer.
  • Build Construction Packages using entire Microsoft suite,
  • Review CADS and Work Prints in relation to permitting and construction contractor assignment.
  • Review GIS software and records info to determine build type, size, and cost.

General Foreman- Linecrew /Copper & Fiber Splicer at Robinson Brothers Construction (2015-12 – 2018-02)

  • Complete time sheets with billing and as-builts
  • Hang and lash Copper cable and Fiber Optics to Print specifications and Frontier Requirements.
  • Maintenance Work ( Pole Transfers, Removals, Replacements Etc,,).
  • Pre-field jobs and communicate with customer engineers, inspectors, and supervisors.

General Foreman- Linecrew at CableCom LLC (2015-06 – 2015-12)

  • Place fiber and coax to comcast specifications.
  • Manage and schedule aerial and underground placing and maintenance jobs.
  • Complete timesheets and unit billing to customer specifications.
  • Run weekly safety meetings and yearly safety recertifications.

Aerial Foreman at Sefnco Communications (2014-03 – 2015-06)

  • Place fiber and coax to Comcast specifications.
  • Manage and schedule aerial and underground placing and maintenance jobs.
  • Complete timesheets and unit billing to customer specifications.

Aerial Lineman at Potelco (2013-10 – 2014-03)

  • Place new metal poles for Union Pacific railway communications.
  • Place antennas, cable, splice in new cable & polyphasers and sweep signal.
  • Retrofit existing wood poles with new comm equipment.

Groundman/Lineman at Sefnco Communications (2011-04 – 2013-10)

  • Assist line crew foreman in placing and splicing new coaxial and fiber cables

Education

Certificate-of-Completion in Electrical Line worker Training Program – Northwest Lineman College (2012 – 2012)

Diploma – Stanwood High School (2010 – 2010)

Skills

Fiber Construction and Splicing Manager

Reviews