SCHEDULER - GIP
(2021-04)
Project Experience: Vale – Voisey's Bay Underground Mine & CAPEX Projects, Nalcor – Spillway Gate Refurbishment, Bay D'Espoir Hydro Power Station, & Lower Churchill Project (Synchronous Condeser), Greenland – Amaroq Gold Mine Expansion
- Develop and maintain Primavera P6 schedules for large-scale construction and industrial projects
- Perform critical path analysis, progress tracking, and forecasting to support project execution
- Produce weekly client reports including KPIs, manpower forecasts, and earned value metrics
- Coordinate with project managers, superintendents, and clients to ensure schedule accuracy and alignment
JUNIOR SCHEUDLER - AKER SOLUTIONS
(2020-03 - 2020-05)
- Utilized Primavera P6 to compile and maintain the EPCM contracts on Husky's SeaRose FPSO
- Analyze the P6 schedule daily to maintain resource forecasting, critical path analysis, and baseline variance
- Coordinated weekly schedule meetings between employer and client
SCHEDULER - GENERAL ELECTRIC – RENEWABLE ENERGY
(2019-07 - 2020-03)
- Utilized Primavera P6, Microsoft Project, and Milestone to maintain the EPC contract for the Lower Churchill Project (Soldiers Pond Site)
- Improve project strategy by analyzing deviations from the critical path using P6
- Maintain monthly and weekly reports for the client (NALCOR)
ENGINEERING STUDENT - EXXONMOBIL
(2018-09 - 2018-12)
- Preliminary scoping, Cost estimating, and scheduling for various offshore projects on the Hibernia platform
- Utilizing HYSYS to model upstream and oil and gas systems
- Analyzing production data to improve flow behavior and maintain integrity of the Chemical Injection system
- Utilized SAP to improve Prevent Maintenance Plans for the Chemical Injection system
ENGINEERING STUDENT - GENERAL ELECTRIC – REWABLE ENERGY
(2018-01 - 2018-05)
- Preparation of Daily site reports and progress updates
- Data collection from field instrumentation
- Prepared Static and Dynamic completion check sheets for the commissioning team
- P&ID revisions related to Non-Conformance Reports
ENGINEERING STUDENT - NORTH ATLANTIC REFINING LTD
(2017-05 - 2017-08)
- Create and update construction work packs for Crude holding tank projects
- Develop and progress the Engineering Design man hour allocation schedule
ENGINEERING STUDENT - BIRD HEAVY CIVIL CONSTRUCTION
(2017-09 - 2017-12)
- Expand and maintain "REA" database
- Analysis of construction schedule to determine variances in project objectives
- Revisions of construction drawings and tender documents