Skip to main content
Ye Wint Aung

Ye Wint Aung

Senior Land Surveyor

Talent
New York City, New YorkMember since April 15, 2024
Land SurveyingAUTOCADAUTOCAD CIVIL 3DLAND DEVELOPMENTMicrosoft OfficeAdvanced Surveying & Survey Instruments ApplicationGPS EquipmentHigh-Precision Control Point ManagementTopographic SurveyAs-Built SurveyEarthwork Volume CalculationsDeformation & Settlement MonitoringQuality Assurance
·

Hire this person

Send a job offer directly to this candidate

Land SurveyingAUTOCADAUTOCAD CIVIL 3DLAND DEVELOPMENTMicrosoft Office

About

I have more than 12 years working experiences in Land Surveying field. (In Road Construction and Building)

Experience

Senior Surveyor at OKUMURA Corporation (2025-10 – Present)

  • High-Precision Control Point Management: Establishing and maintaining a robust network of global control points and benchmarks for water treatment facilities, ensuring sub-millimeter accuracy in line with Japan's strict construction standards
  • Structural Layout for Massive Concrete Facilities: Executing complex setting out for sedimentation basins, filtration beds, and water tanks using AutoCAD Civil 3D to ensure precise grid line and boundary alignment
  • Comprehensive Earthwork & Excavation Analysis: Managing large-scale excavation for the removal of old reservoirs and calculating precise earthwork volumes using Digital Elevation Models (DEM) and Civil 3D software
  • Deformation & Settlement Monitoring: Conducting weekly verticality alignment checks and settlement monitoring of surrounding structures and newly built tanks to ensure site stability and safety
  • As-Built Data Acquisition & Digital Twin Documentation: Capturing precise as-built measurements and preparing comprehensive digital documentation for final submission to the Osaka Water Supply Authority
  • Collaborative Engineering & Technical Liaison: Coordinating directly with Japanese lead engineers and subcontractors to resolve on-site measurement discrepancies and ensure smooth project progress
  • Quality Assurance of Survey Instrumentation: Overseeing the routine calibration of Total Stations and GPS equipment, maintaining detailed records and certificate to meet Japanese quality management (ISO) requirements
  • Workflow Optimization through Automation: Utilizing custom LISP routines and mobile survey applications to automate coordinate transformations and point data imports, significantly reducing manual processing time
  • Leadership & Safety Management: Supervising daily operations for multiple survey teams, ensuring all field activities adhere to Japan's rigorous Occupational Health and Safety (OHS) regulations
  • Pre-Construction Design Verification: Conducting detailed reviews of site plans and pre-computation drawings to identify potential spatial conflicts before construction begins, providing technical solutions to the design team

Senior Land Surveyor at SUPER SEVEN STAR DEVELOPMENT Co.,Ltd (2024-06 – 2025-06)

  • Detail Topographic survey for 260acre project
  • Verify the pre-com drawing, site plan drawing before start site work
  • Verify the accuracy of survey data and control points of Register surveyos traverse
  • Prepare coordinate lists of site plan to peg on site
  • Prepare calculation road level, drain invert and top level
  • Volume calculation of stock pile & earthwork by manual and software
  • Layout of the footing points, road kerb line, road reverse line, boundary line design plan

Senior Land Surveyor at Fujita Corporation (2021-06 – 2024-05)

YANGON-MANDALAY RAILWAY IMPROVEMENT PROJECT

  • Verify the pre-com drawing, site plan drawing before start site work
  • Verify the accuracy of survey data and control points of Register surveyors traverse
  • Prepare coordinate lists of site plan to peg on site
  • Prepare calculation road level, drain invert and top level
  • Volume calculation of stock pile & earthwork by manual and software
  • Layout of the pile points, road kerb line, road reverse line, boundary line design plan
  • Layout of column center line, pile cap, soffit and cross head of the Flyover
  • Take ECC of pile and calculation of ECC
  • Take TOPO of the existing road, road etc., to join new road and drain
  • Take coordinate and level of services line and prepare the trail trench drawing
  • Monitoring of the Flyover and Building
  • Setting out for pile cap position, column center line, wall alignment, gird line and boundary line
  • Levelling (Pile cut off level, pile cap top level, reference level)
  • Verify the layout pegs every evening
  • Take TOPO for as-built drawing
  • Prepare the as-built drawing and submission
  • Details Topographic survey for project
  • Layout of column center line, location check for anchor bolt installation work
  • Take as-built and data calculation work
  • Setting out for footing position, column center line, wall alignment, gird line and boundary
  • Levelling (reference level)
  • Manage and arrange daily job divisions of many survey teams

Senior Land Surveyor, Land Surveyor at BYMA Construction Co.Ltd, Yangon (Dragages Pte.Ltd) (2014-06 – 2021-05)

Landmark & Peninsula Project (Project Value – US$70 Million) and Star City Project (Project Value – US$94 Million)

  • Manage and arrange daily job divisions for many survey teams
  • Prepare and review for site as-built drawing
  • Solve some problems of site drawing and preparing solutions to client
  • Prepare all data, charts, plots, maps, records and documents related to the project
  • Coordinate with subcontractors to catch up the progress and to conduct accurate measurements
  • Liaise with supervision, design team and conduct site visits weekly and update surveying data
  • Ensure all survey instrument is calibrated with records, certificates and consistently update
  • Maintain GPS Control Bench Marks for monthly report
  • Share knowledge to the team members (Juniors) to growth up continuously in weekly basic
  • Arrange records of survey data including the shape, counter, location, elevation and dimensions of land or features for daily reports
  • Solve some miscellaneous things as problem of site drawing at site
  • Maintain the heritage building for monitoring survey, the high rise building vertically alignment and settlement level check by weekly
  • Responsible for the Topographic Survey, Land Survey, River Profile Survey, Traverse Survey, Interior Survey, Ground Survey, Earthworks Survey, Levelling Survey and Piling Work
  • Take As-built Survey, Settings out Survey for Cross-section, Profile and Alignment Survey, As-built Drawing Survey by using AutoCAD Civil 3D
  • Calculate the volume by using AutoCAD Civil 3D Land Development and AutoCad Civil 3D
  • Prepare progress and program for weekly and monthly report

Assistance Land Surveyor at Suntac Engineering and Construction Co.Ltd (2013-11 – 2014-06)

YANGON CIRCULAR RAILWAYS PROJECT and Sedona Hotel Project

  • Responsible for the Topographic and Construction Survey, Alignment Survey, Leveling Survey, Land Survey, Setting out for Grid line Survey, Boundary Surveys
  • Take As-built Survey Drawing by using AutoCAD Civil 3D, Monitoring Survey, Verify the accuracy of Survey Data, including measurements and calculations conducted at survey site
  • Take Earthwork Volume calculations and export DEM (Digital Elevation Model) file during excavation
  • Prepare control points, construction stake out position, RTK and leveling and maintain control bench marks
  • Prepare and review for site as-built drawing
  • Take Weekly building monitoring, ground settlement level and water level and Monthly traverse coordinate and leveling
  • Prepare daily report and weekly report to HODs

Education

Bachelor of Science in Geology – University of Mawlamyine, Mon State, Myanmar (2010 – 2013)

Skills

Senior Land Surveyor

Reviews

Related